This container was built as a mobile workshop/welfare unit for the Royal Yachting Association, to be used by the British Olympics Sailing Team for the Beijing 2008 Olympics.
• Converted from a 40ft high cube
tunnel container with double ISO
container doors at both ends.
• Converted for all equipment to
mainain the sailing teams boats;
fully lined, air conditioning, lighting,
work benches, ice machine, water
treatment system and internal floor
drain system.
• Exterior recess to house generator
for self-sufficient power and water.

Sitemap